Concord High School

Concord High School

CONCORD HIGH SCHOOL

Acres

6.91

Sq. Feet

534,000

Address

170 Warren Street

Construction Date

1929, 1996

Fuel

Natural Gas

System

6 Cleaver Brooks Boilers

Grade Levels

9 – 12

Student Population

1,593

Shelter

American Red Cross

 

2008 - 2019

  • Installing building wide security system, including complete 57 exterior door replacements, card access, 192 cameras (interior/exterior).
  • All roofs new as of summer of 2019. 40-year warranty.
  • Created a new pick up and drop off location, redesigned exterior walking paths and emergency vehicle access to the property.
  • Added 7 more new parking spaces along Woodman St.
  • Painted all interior stairwells and hallways throughout the school.
  • Redesigned computer engineering and graphic arts classrooms.
  • Gym floor renovation.
  • Steam heating plant conversion to natural gas. Added 6 new Cleaver Brooks Boilers.
  • Added new paving and increased parking on Westbourne St. parking lot.
  • Converted entire building automation system to Siemens Controls.
  • Demolished the old childcare building, located across the street from CHS.
  • Exterior painting of the building.
  • Addition to library media center, student help desk and maker space design.
  • Redesigned theater performing arts classroom.
  • Replaced student center flooring with rubber tile.
  • Replaced the entire music wing roof.
  • Built a new Cosmetology teaching area.
  • Upgraded Culinary Arts.
  • Compete exterior door replacement.
  • 200 interior/ exterior security cameras installed.